November 2024

Two Brightline trains per hour zip through the park. One at about 20 minutes after and another 20 minutes before the hour.
Northbound train approaches the road crossing.
Southbound train at the same road crossing.
Southbound train from the old service road south of the road crossing.
Engine 108 is the other end of the train set that had the unfortunate collision with a Fire engine ladder truck. For more about the accident, see this CNN story. Fire Truck Collission with Brightline train
Northbound Brightline
Northbound Brightline passing a local freight train.
#501 is an EMD GP38 locomotive built in 1977.
One of the crew is resting outside on a step as the train slowly moves north with a load of gondolas.
Southbound Brightline in the distance.
Southbound Brightline 120,
closer and,
close enough to see the engineer.
Northbound Brightline
Southbound Brightline
This is the former road, now a bike and walking trail, that parallels the tracks.
Look closely and you might find an otter headed southbound on the western track.
The yellow circle shows where the otter, and several trains, were photographed. Pine Grove Campground sites are visible on the right side of the photo.
A pair of GE ES44C4 in the Florida East Coast Railway’s Champion color scheme.
This color scheme is getting rare on the line as the locomotives are being repainted with the Black & White stripes of the railway’s new owner: Grupo México
Bonus Videos
Sunset Northbound Brightline through Jonathan Dickinson State Park
Brightline Crossing the Loxahatchee River at Sawmill Park
Brightline in Jupiter at Sawmill Park
Sounthbound Brightline (Kissimee wrap) through Jonathan Dickinson State Park
Today’s Route
JD State Park to Sawmill Park